Evaluasi Kinerja Pengelolaan Persediaan Finished Goods dengan Metode SCOR DS

Authors

  • Frea Marva Zerlinda IPB University
  • Fattah Jati Pangestu IPB University
  • Agung Prayudha Hidayat IPB UNiversity
  • Sesar Husen Santosa IPB UNiversity

Keywords:

Overcapacity, Finished Goods Warehouse, SCOR DS, Performance Evaluation, Inventory Days of Supply

Abstract

Finished goods warehouse management plays a crucial role in ensuring the smooth distribution process within manufacturing companies. This study aims to evaluate inventory management performance to address the phenomenon of overcapacity resulting from inventory buildup. The evaluation was conducted using the Supply Chain Operations Reference Digital Standard (SCOR DS) framework. Through a breakdown analysis, it was found that the strategic metric Cash-to-Cash Cycle Time had the lowest performance, caused by the critical value of the operational metric Inventory Days of Supply, which was 0.03978. This finding proves that the length of time goods remain in the warehouse due to the absence of a standardized inventory movement classification system is the main cause of overcapacity. The research recommendations focus on synchronizing capacity planning to reduce storage duration and optimize warehouse space utilization.

References

ASCM, A. for S. C. M. (2020). ASCM Supply Chain Operations Reference Model SCOR Digital Standard.

Budianto, B. D. S., & Suryadi, A. (2025). Analisis Penyebab Terjadinya Overcapacity Pada Gudang Menggunakan Metode Root Cause Analysis (RCA) di PT. XYZ. Jurnal Serambi Engineering (JSE), X(1), 12627–12633.

Calystania, V., Gebee Hasvia, T., Jones, J. H., Bhuan, S., & Valentino, J. (2022). Analisis Manfaat Penerapan Manajemen Rantai Pasok dan ERP. Dalam Online) JURNAL MANAJEMEN (Vol. 14, Nomor 2).

Hidayatullah, T., & Wibisono, S. (2022). Pembobotan Atribut Dengan Pairwise Comparison Pada Case Based Reasoning Deteksi Dini Penyakit Gigi Menggunakan KNN. Jurnal Explore IT, 14(1), 17–23. https://doi.org/10.35891/explorit

Nafiah, G. S. (2024). Usulan Peningkatan Kinerja Rantai Pasok Pada Atribut Responsiveness Menggunakan Metode Supply Chain Operations Reference Digital Standard (SCOR DS) Version 14.0 (Studi Kasus: Raxsa.co Apparel). https://dspace.uii.ac.id/handle/123456789/52396

Nurmayasari, H., & Vidada, I. A. (2026). Analisis Penilaian Kinerja Karyawan dengan Menggunakan Metode Key Performance Indicator (KPI) pada CV. XYZ. Jurnal Inovasi Bisnis Manajemen dan Akuntansi, 4(2).

Octaviany, T., & Gunawan, A. (2023). Mengoptimalkan Manajemen Persediaan Melalui Teknologi Rantai Pasokan. Journal Of Informatics And Busisnes, 1(3), 150–155.

Purnama, D. A., Novianto, D., & Haryanti, N. L. (2025). Jurnal Sistem Teknik Industri Measuring Supply Chain Performance and Developing Competitive Strategy on Small Medium Enterprise Craft Industry using SCOR-AHP Model. Jurnal Sistem Teknik Industri, 27(3), 203–220. https://doi.org/10.32734/register.v27i1.idarticle

Putri, A. R., Fijra, R., Danu, M., & Juniarto, T. (2024). Pendekatan Lean dalam Waste Assessment Model untuk Efektivitas Manajemen Rantai Pasok di Gudang Perusahaan Lean Approach in Waste Assessment Model for Supply Chain Management Effectiveness in Company Warehousing. Integrasi Jurnal Ilmiah Teknik Industri, 09(02), 193–201. https://doi.org/10.32502/i

Yusuf, A. M., & Soediantono, D. (2022). Supply Chain Management and Recommendations for Implementation in the Defense Industry: A Literature Review. International Journal of Social and Management Studies (IJOSMAS), 3(3), 63–77.

Downloads

Published

2026-05-19

How to Cite

Zerlinda, F. M., Jati Pangestu, F., Prayudha Hidayat, A., & Husen Santosa, S. (2026). Evaluasi Kinerja Pengelolaan Persediaan Finished Goods dengan Metode SCOR DS. AI Dan SPK : Jurnal Artificial Intelligent Dan Sistem Penunjang Keputusan, 3(4), 399–406. Retrieved from https://jurnalmahasiswa.com/index.php/aidanspk/article/view/3886